City Utilities of Springfield · Missouri

How City Utilities of Springfield credits home solar

What happens to the solar power your home sends to the grid, the size limits, and the steps to connect, checked against City Utilities of Springfield's own tariffs and the state rules.

Check your home

About a minute. No cost, no obligation.

Step 1 of 3

Do you own the home?

Typical monthly electric bill

How much shade is on your roof?

Texts are optional. Your request goes to one local company, never a list.

The rules

What happens to the solar power you send to the grid

City Utilities of Springfield is a municipally owned utility whose service territory covers about 320 square miles in southwest Missouri, including all of the city of Springfield, portions of Greene County and part of northern Christian County.

Electric Interconnection and Net Metering (CU Policy 5.02)

How City Utilities of Springfield credits exports

  • City Utilities of Springfield offers net metering under CU Policy 5.02, Electric Interconnection and Net Metering, which its Board of Public Utilities approved to implement Missouri's Net Metering and Easy Connection Act, RSMo 386.890.
  • For systems of 100 kW or less, CU nets the electricity it delivers against the electricity your system sends back during each billing period, and if you use more than you send back, you are billed for the net amount.
  • If you send back more than you use, you are billed the customer charge for your rate and the surplus kilowatt hours are credited at CU's Net Metering Avoided Variable Cost of Generation rate.
  • CU recalculates that rate twice a year, for April through September and for October through March, from its projected fuel, fuel handling, pollution control and transmission costs.
  • CU meters the energy your system produces separately from the energy you consume in each billing period.
  • Missouri's net metering law, which CU's policy says it implements, provides that unused credits expire without payment 12 months after they are issued or when you disconnect service or end net metering, whichever comes first.

Before you connect

Limits, and the steps to get connected

Limits and eligibility

  • CU's net metering credit applies to systems with an accredited capacity of 100 kW or less, and larger systems are not netted but are credited under a separate special contract rate.
  • CU's policy describes a qualifying unit as one owned by the customer, located on premises the customer owns, leases or controls, and intended primarily to offset part or all of the customer's own electricity needs.
  • CU is not required to sign new net metering agreements once total customer generation reaches 5% of its single hour peak load from the previous year, or once capacity approved in a calendar year reaches 1% of that peak.
  • Systems larger than 10 kW must carry liability insurance and conduct a yearly test confirming the system stops sending power within two seconds of being disconnected, neither of which CU requires for systems of 10 kW or less.

How a home gets connected

  1. Submit CU's Interconnection Application for Net Metering Systems of 100 kW or less, with plans and specifications for the system, before any construction begins.
  2. CU gives written approval or denial within 30 days for systems of 10 kW or less and within 90 days for larger systems, and its application says not to begin construction until written approval arrives.
  3. Inside Springfield city limits, Building Development Services requires an electrical permit for nearly all electrical work, and permit applications can be made through the city's eCity portal.
  4. After construction, a professional electrical engineer registered in Missouri or an electrician licensed in Springfield inspects the system and signs the Post Installation Electrical Inspection section, and the customer signs the acknowledgement section and returns the completed application to CU.
  5. Once CU approves those sections in writing, it interconnects the system, normally within 30 days where electric service already exists, and the system may not run in parallel with CU's grid before that approval.

Federal tax credit

The residential solar credit (section 25D) ended for systems completed after 2025. What that means in 2026.

Where we work

Cities we cover in City Utilities of Springfield's area

Each city page adds who issues permits there, with links to the official sources.

State rules

Questions

Common questions about City Utilities of Springfield and solar

Does City Utilities of Springfield offer net metering?

Yes. For systems of 100 kW or less, CU nets the electricity it delivers against the electricity your system sends back during each billing period. Any surplus is credited at CU's Net Metering Avoided Variable Cost of Generation rate, which CU recalculates twice a year.

Do I need City Utilities approval before installing solar in Springfield?

Yes. CU says you must submit a Net Metering Application and have it approved before construction begins, and its application says not to start until you have written approval. After installation, a professional electrical engineer registered in Missouri or an electrician licensed in Springfield must inspect the system before CU will interconnect it.

Who sets the net metering rules for City Utilities of Springfield?

CU is a municipally owned utility, and the Missouri Public Service Commission does not set rates for city owned electric systems. Missouri's net metering law leaves the interconnection and net metering contract for municipal utilities to their governing bodies, and CU's policy was approved by its Board of Public Utilities, whose members are appointed by the Springfield City Council.

Is there still a federal tax credit for home solar?

The federal residential clean energy credit, section 25D, ended for home solar expenditures made after December 31, 2025, under the law signed July 4, 2025. The IRS treats the expenditure as made when installation is completed, so a system completed in 2026 does not qualify even if it was paid for earlier.

Does the consultation cost anything?

No. The consultation is free for homeowners, and there is no obligation to buy anything.

Who will contact me?

Our team confirms a few details with you, then one local solar company for your area contacts you to set up the visit. Your request never goes to a list.

Sources (checked September 26, 2026)

Tariffs and programs change, so confirm current terms with City Utilities of Springfield before you decide.

Answers homeowners look for

See if solar fits your home

Free, no obligation, and your request goes to one local company.

Get my free consultation
Get my free consultation