City Utilities of Springfield · Missouri
How City Utilities of Springfield credits home solar
What your reps need to know about City Utilities of Springfield before the appointment: how exports are credited, the size limits, and the steps to connect, checked against its own tariffs and the state rules.
- Each appointment goes to one company
- Only sits count, approved disputes get a replacement
- Market facts checked September 26, 2026
The rules
What happens to the solar power a home sends to the grid
City Utilities of Springfield is a municipally owned utility whose service territory covers about 320 square miles in southwest Missouri, including all of the city of Springfield, portions of Greene County and part of northern Christian County.
How City Utilities of Springfield credits exports
- City Utilities of Springfield offers net metering under CU Policy 5.02, Electric Interconnection and Net Metering, which its Board of Public Utilities approved to implement Missouri's Net Metering and Easy Connection Act, RSMo 386.890.
- For systems of 100 kW or less, CU nets the electricity it delivers against the electricity your system sends back during each billing period, and if you use more than you send back, you are billed for the net amount.
- If you send back more than you use, you are billed the customer charge for your rate and the surplus kilowatt hours are credited at CU's Net Metering Avoided Variable Cost of Generation rate.
- CU recalculates that rate twice a year, for April through September and for October through March, from its projected fuel, fuel handling, pollution control and transmission costs.
- CU meters the energy your system produces separately from the energy you consume in each billing period.
- Missouri's net metering law, which CU's policy says it implements, provides that unused credits expire without payment 12 months after they are issued or when you disconnect service or end net metering, whichever comes first.
Before a home connects
Limits, and the steps to get connected
Limits and eligibility
- CU's net metering credit applies to systems with an accredited capacity of 100 kW or less, and larger systems are not netted but are credited under a separate special contract rate.
- CU's policy describes a qualifying unit as one owned by the customer, located on premises the customer owns, leases or controls, and intended primarily to offset part or all of the customer's own electricity needs.
- CU is not required to sign new net metering agreements once total customer generation reaches 5% of its single hour peak load from the previous year, or once capacity approved in a calendar year reaches 1% of that peak.
- Systems larger than 10 kW must carry liability insurance and conduct a yearly test confirming the system stops sending power within two seconds of being disconnected, neither of which CU requires for systems of 10 kW or less.
How a home gets connected
- Submit CU's Interconnection Application for Net Metering Systems of 100 kW or less, with plans and specifications for the system, before any construction begins.
- CU gives written approval or denial within 30 days for systems of 10 kW or less and within 90 days for larger systems, and its application says not to begin construction until written approval arrives.
- Inside Springfield city limits, Building Development Services requires an electrical permit for nearly all electrical work, and permit applications can be made through the city's eCity portal.
- After construction, a professional electrical engineer registered in Missouri or an electrician licensed in Springfield inspects the system and signs the Post Installation Electrical Inspection section, and the customer signs the acknowledgement section and returns the completed application to CU.
- Once CU approves those sections in writing, it interconnects the system, normally within 30 days where electric service already exists, and the system may not run in parallel with CU's grid before that approval.
Federal tax credit
The residential solar credit (section 25D) ended for systems completed after 2025. What that means in 2026.
Where we work
Markets we cover in City Utilities of Springfield's area
Availability depends on territory. Each market page adds who issues permits there, with links to the official sources.
State rules
Questions
Common questions about City Utilities of Springfield and solar
Does City Utilities of Springfield offer net metering?
Yes. For systems of 100 kW or less, CU nets the electricity it delivers against the electricity your system sends back during each billing period. Any surplus is credited at CU's Net Metering Avoided Variable Cost of Generation rate, which CU recalculates twice a year.
Do I need City Utilities approval before installing solar in Springfield?
Yes. CU says you must submit a Net Metering Application and have it approved before construction begins, and its application says not to start until you have written approval. After installation, a professional electrical engineer registered in Missouri or an electrician licensed in Springfield must inspect the system before CU will interconnect it.
Who sets the net metering rules for City Utilities of Springfield?
CU is a municipally owned utility, and the Missouri Public Service Commission does not set rates for city owned electric systems. Missouri's net metering law leaves the interconnection and net metering contract for municipal utilities to their governing bodies, and CU's policy was approved by its Board of Public Utilities, whose members are appointed by the Springfield City Council.
Is there still a federal tax credit for home solar?
The federal residential clean energy credit, section 25D, ended for home solar expenditures made after December 31, 2025, under the law signed July 4, 2025. The IRS treats the expenditure as made when installation is completed, so a system completed in 2026 does not qualify even if it was paid for earlier.
Questions from solar companies and reps
What am I buying?
Preset appointments with homeowners in your territory who agreed to a solar consultation. We confirm they own the home and that every decision maker on the title will be there, book a time that fits your calendar, and send you the details.
What counts as a sit?
A sit means the owner of the home is there, every decision maker on the title is there, and the visit happens at the booked time or a new time the homeowner and your team agree on. If one does not sit, your team has 48 hours after the visit time to dispute it with a reason. An approved dispute earns a replacement appointment, never a cash refund.
Are the appointments exclusive?
Yes. Each appointment goes to one company only and is never sold twice.
How to buy solar appointments, and the questions to ask any appointment setter
Sources (checked September 26, 2026)
- City Utilities: net metering
- CU Policy 5.02: electric interconnection and net metering
- CU Electric Rates Sheet No. 21: net metering avoided variable cost of generation
- CU Electric Rates Sheet No. 22: avoided variable cost of energy (over 100 kW)
- CU interconnection application, net metering systems 100 kW or less
- City Utilities 2025 Quick Facts
- City Utilities fiscal 2025 financial statements
- About CU
- Missouri PSC: who the PSC regulates
- Missouri statute RSMo 386.890
- City of Springfield: building permits and codes
- City of Springfield: Building Development Services
- IRS: changes to section 25D
Tariffs and programs change, so confirm current terms with City Utilities of Springfield.
What your reps will get asked
Get preset solar appointments
Each appointment goes to one company, and only sits count.
Get appointments