Evergy · Missouri and Kansas
How Evergy credits home solar
What your reps need to know about Evergy before the appointment: how exports are credited, the size limits, and the steps to connect, checked against its own tariffs and the state rules.
- Each appointment goes to one company
- Only sits count, approved disputes get a replacement
- Market facts checked September 26, 2026
The rules
What happens to the solar power a home sends to the grid
Evergy serves more than 1.7 million customers in Kansas and Missouri through four service areas: Evergy Missouri Metro, Evergy Missouri West, Evergy Kansas Metro and Evergy Kansas Central.
How Evergy credits exports
- Evergy's net metering rules depend on the state: Evergy Missouri Metro and Evergy Missouri West follow Missouri's Net Metering and Easy Connection Act, RSMo 386.890, while Evergy Kansas Central and Evergy Kansas Metro follow the Kansas act, K.S.A. 66-1263 through 66-1271.
- In Missouri, Evergy nets the electricity it delivers against the electricity your system sends back over each billing period, and any excess is credited on the following bill at a rate calculated from Evergy's avoided fuel cost.
- In Kansas, for systems that began operating on or after July 1, 2014, excess power left at the end of a billing period is credited at 100% of Evergy's monthly system average cost of energy, which Evergy describes as a wholesale rate.
- In both states, customers on Evergy's residential time of use schedules have usage and exports netted separately for each time period, such as peak, off peak and super off peak.
- Evergy says leftover bill credit rolls over to the next month but any balance left after 12 months expires without being paid out, and Missouri law also ends credits sooner if you disconnect service or end net metering.
- Kansas customers who began net metering before July 1, 2014 keep an older rule that carries excess kilowatt hours forward one for one to later months, with unused credit expiring each March 31, until January 1, 2030, when Kansas law moves all customer generators to a credit of at least 100% of the monthly system average cost of energy.
The rule behind it
Recent changes
Kansas House Bill 2527 took effect July 1, 2024, raising the net metering export limit to 150 kW AC with a sizing formula, stepping the program cap up each July until it reaches 5% in 2027, and changing monthly billing, including netting by time period for time varying rates, and Evergy's Kansas net metering tariffs were revised effective October 22, 2024. In Missouri, Evergy's tariffs say that as of January 1, 2025, new or expanded systems are measured with separate meters for consumption and production.
Before a home connects
Limits, and the steps to get connected
Limits and eligibility
- In Missouri, Evergy's net metering tariffs cover systems up to 100 kW DC, and the largest system allowed is found by dividing the last 12 months of net usage by 8,760 hours and then by a solar capacity factor of 0.144.
- In Kansas, systems that began operating after July 1, 2014 may export up to 150 kW AC, sized to the prior 12 months of use with the formula in K.S.A. 66-1267, and for systems interconnected on or after January 1, 2026, generating capacity may not exceed approved export capacity by more than 50%.
- Missouri net metering is first come, first served until net metered capacity reaches 5% of the prior year's single hour peak load, and Evergy need not approve more applications in a calendar year once approvals reach 1% of that peak; in Kansas the cap is 4% of the prior year's peak demand from July 1, 2026 and 5% of the highest annual peak since 2014 from July 1, 2027.
- Evergy requires customers to be in good standing, with no past due balance, no payment arrangement and no written off bad debt, and it says it cannot count future load such as a pool or a new electric vehicle when setting the maximum system size.
How a home gets connected
- Confirm which of the four Evergy jurisdictions serves the home, which Evergy says is listed under the Message Board on the first page of the bill, because each territory has its own application and rules.
- The homeowner or installer applies through Evergy's online portal for projects under 200 kW with equipment spec sheets, a site plan, a one line drawing that includes a production meter, a photo of the service meter, and signed forms, which are a customer acknowledgement form in Kansas or Section C of the net metering agreement in Missouri.
- Evergy reviews the application for accuracy and then completes an engineering review, and after approval Evergy says the system should be installed within 12 months.
- After installation, request the meter exchange through the application portal, make sure any required city or county inspection reports have been sent, and provide photos of the installed equipment, plus Sections C through F of the net metering agreement for Missouri projects.
- Evergy then replaces the existing meter with a net or bidirectional meter, which requires a passed city or county inspection report, and Evergy asks customers not to turn the system on until they are notified that the meter exchange is complete.
Federal tax credit
The residential solar credit (section 25D) ended for systems completed after 2025. What that means in 2026.
Where we work
Markets we cover in Evergy's area
Availability depends on territory. Each market page adds who issues permits there, with links to the official sources.
State rules
Questions
Common questions about Evergy and solar
Does Evergy offer net metering in both Missouri and Kansas?
Yes. Missouri law requires every retail electric supplier, including Evergy Missouri Metro and Evergy Missouri West, to offer net metering, and Kansas law requires investor owned utilities such as Evergy Kansas Central and Evergy Kansas Metro to offer it to customers in good standing. The rules differ by state, so Evergy suggests verifying your territory early in the process.
Do Evergy solar credits expire?
Yes. Evergy says leftover bill credit rolls over month to month, but any balance left after 12 months expires and is not paid out, and in Missouri credits also end if you disconnect service or end net metering. Kansas customers who began net metering before July 1, 2014 follow an older rule under which unused excess credit expires each March 31.
How large a solar system will Evergy allow?
Evergy sets the limit at the lower of a size based on your last 12 months of usage or the state maximum, which it lists as 100 kW DC in Missouri and 150 kW AC in Kansas. The usage formula divides 12 months of kilowatt hours by 8,760 hours and then by a 0.144 capacity factor, and for new homes without a usage history Evergy estimates annual use at 7.15 kilowatt hours per square foot of conditioned space.
Is there still a federal tax credit for home solar?
The federal residential clean energy credit, section 25D, ended for home solar expenditures made after December 31, 2025, under the law signed July 4, 2025. The IRS treats the expenditure as made when installation is completed, so a system completed in 2026 does not qualify even if it was paid for earlier.
Questions from solar companies and reps
What am I buying?
Preset appointments with homeowners in your territory who agreed to a solar consultation. We confirm they own the home and that every decision maker on the title will be there, book a time that fits your calendar, and send you the details.
What counts as a sit?
A sit means the owner of the home is there, every decision maker on the title is there, and the visit happens at the booked time or a new time the homeowner and your team agree on. If one does not sit, your team has 48 hours after the visit time to dispute it with a reason. An approved dispute earns a replacement appointment, never a cash refund.
Are the appointments exclusive?
Yes. Each appointment goes to one company only and is never sold twice.
How to buy solar appointments, and the questions to ask any appointment setter
Sources (checked September 26, 2026)
- Evergy: private solar and net metering
- Evergy: solar and net metering program information
- Evergy: 2026 solar application process details
- Evergy Missouri Metro: Schedule NM net metering tariff
- Evergy Missouri Metro: rate book with Schedule NM TOU
- Evergy Missouri West: rate book with net metering sheets 110 to 120
- Evergy Kansas Central: rate book with Net Metering Rider (Schedule NMR)
- Evergy Kansas Metro: Schedule NM net metering tariff
- Evergy: company facts
- Missouri statute RSMo 386.890
- Kansas statute K.S.A. 66-1265
- Kansas statute K.S.A. 66-1266
- Kansas statute K.S.A. 66-1267
- Kansas Corporation Commission: net metering
- Kansas Corporation Commission: net metering in Kansas
- Missouri PSC: who the PSC regulates
- IRS: changes to section 25D
Tariffs and programs change, so confirm current terms with Evergy.