Georgia Power · Georgia
How Georgia Power credits home solar
What your reps need to know about Georgia Power before the appointment: how exports are credited, the size limits, and the steps to connect, checked against its own tariffs and the state rules.
- Each appointment goes to one company
- Only sits count, approved disputes get a replacement
- Market facts checked September 26, 2026
The rules
What happens to the solar power a home sends to the grid
Georgia Power, an investor owned utility fully regulated by the Georgia Public Service Commission, serves approximately 2.7 million customers in 155 of Georgia's 159 counties.
How Georgia Power credits exports
- Georgia Power credits home solar through its Renewable and Nonrenewable Resources tariff, Schedule RNR 11, which has applied since bills rendered in January 2023 and whose charges and payments are subject to approval by the Georgia Public Service Commission.
- New residential customers can join RNR Instantaneous Netting, where excess energy is the electricity a home sends to the grid at any moment beyond what Georgia Power is supplying to the home at that same moment.
- All excess energy earns two credits, a Renewable Generation Credit based on Georgia Power's solar avoided energy cost, which is updated every year, and a Renewable Generation Adder at a fixed rate the Commission approved in Georgia Power's 2022 rate case, and both are summed each month and used to reduce the total monthly bill.
- The older RNR Monthly Netting option, which first uses a month's excess energy to reduce that month's usage, is limited to customers already in its existing 5,000 customer pilot and is not available to anyone else.
- Monthly Netting lasts no longer than 15 years and expires no later than December 31, 2038, after which those customers are moved automatically to Instantaneous Netting.
- A customer who installs a system without choosing a program is enrolled in Energy Offset Only, which pays nothing for energy sent to the grid.
The rule behind it
Georgia Cogeneration and Distributed Generation Act of 2001, O.C.G.A. 46-3-50 et seq.
The program
Renewable and Nonrenewable Resources (RNR) tariff, RNR Instantaneous Netting, Schedule RNR 11
Recent changes
Georgia Power updates the solar avoided energy cost behind the Renewable Generation Credit every year, and its rooftop solar FAQ lists the value that applies for 2026.
Before a home connects
Limits, and the steps to get connected
Limits and eligibility
- Residential systems qualify for the RNR tariff only with a peak generating capacity of 10 kW AC or less, measured by the combined nameplate capacity of the inverters at the service point.
- RNR Instantaneous Netting is available on a first come, first served basis until the combined capacity of all renewable sources reaches 0.2 percent of Georgia Power's annual peak demand in the previous year, and Georgia Power says the program is currently open.
- A home whose battery system has been derated and still has a maximum inverter capability greater than 10 kW cannot take part in the RNR program.
- RNR Monthly Netting cannot be moved from one home to another, and it is not available to customers on FlatBill, Pre Pay, Community Solar or Real Time Pricing service.
How a home gets connected
- The homeowner or installer submits an interconnection application in Georgia Power's PowerClerk online tool with a one line electrical diagram, a site plan and equipment specification sheets.
- Georgia Power reviews the application and advises customers not to buy equipment until that review shows how the system can connect to existing Georgia Power equipment and service.
- The customer signs a service and interconnection agreement for the chosen program, which Georgia Power sends through PowerClerk for electronic signature, and a written RNR agreement is required before the system connects or earns credits.
- After installation, every solar and battery system must pass inspection by the local authority having jurisdiction before it connects to the grid.
- Georgia Power may require a witness test, and after the system passes it programs the meter for bidirectional service where applicable, which marks permission to operate, and emails a Permission to Operate letter to the customer and the installer.
Federal tax credit
The residential solar credit (section 25D) ended for systems completed after 2025. What that means in 2026.
Where we work
Markets we cover in Georgia Power's area
Availability depends on territory. Each market page adds who issues permits there, with links to the official sources.
State rules
Questions
Common questions about Georgia Power and solar
Does Georgia Power still offer monthly net metering to new solar customers?
No. RNR Monthly Netting is available only to customers already participating in the existing 5,000 customer pilot and is not open to additional customers. New customers can apply for RNR Instantaneous Netting, which Georgia Power says is currently open for participation.
How big can a home solar system be to get export credits from Georgia Power?
Under the RNR tariff, a residential system must have a peak generating capacity of 10 kW AC or less, based on the combined nameplate capacity of its inverters. A home with a battery whose derated inverter capability is still above 10 kW cannot join the RNR program.
What happens if I install solar but do not sign up for a Georgia Power solar program?
Georgia Power automatically enrolls a customer with an installed system in Energy Offset Only if the customer has not chosen a program. Energy Offset Only customers are not compensated for any excess energy delivered to the grid, and Georgia Power may require equipment that prevents export.
Is there still a federal tax credit for home solar?
The federal residential clean energy credit, section 25D, ended for home solar expenditures made after December 31, 2025, under the law signed July 4, 2025. The IRS treats the expenditure as made when installation is completed, so a system completed in 2026 does not qualify even if it was paid for earlier.
Questions from solar companies and reps
What am I buying?
Preset appointments with homeowners in your territory who agreed to a solar consultation. We confirm they own the home and that every decision maker on the title will be there, book a time that fits your calendar, and send you the details.
What counts as a sit?
A sit means the owner of the home is there, every decision maker on the title is there, and the visit happens at the booked time or a new time the homeowner and your team agree on. If one does not sit, your team has 48 hours after the visit time to dispute it with a reason. An approved dispute earns a replacement appointment, never a cash refund.
Are the appointments exclusive?
Yes. Each appointment goes to one company only and is never sold twice.
How to buy solar appointments, and the questions to ask any appointment setter
Sources (checked September 26, 2026)
- Georgia Power Schedule RNR 11 tariff
- Georgia Power rooftop solar FAQs
- Georgia Power residential interconnection summary, revised August 15, 2025
- Georgia Public Service Commission: electric utilities
- IRS: changes to section 25D
Tariffs and programs change, so confirm current terms with Georgia Power.
What your reps will get asked
Get preset solar appointments
Each appointment goes to one company, and only sits count.
Get appointments